Caution : You must read this before you proceed BASKET Picture Label Picture Description QTY A Top 1 B Right Back 1 C Left Back 1 Page 1 OF 8 Noble House Home Furnishings LLC
D Seat 1 E Pillow 1 F Cushion 1 Description QTY ① Bolt (M6x35mm) 9 ② Bolt (M6x38mm) 7 ③ Washer (M6) 27 ④ Nut 13 ⑤ Bolt Cap 15 ⑥ Nut Cap 13 ⑦ Spanner 1 ⑧ Allen Key 1 Label Picture Page 2 OF 8 Noble House Home Furnishings LLC
Before Beginning Assembly: Page 3 OF 8 Noble House Home Furnishings LLC
Overview Top(A) Pillow(E) Left Back (C) Right Back (B) Seat (D) Cushion (F) FRONT FACING This Basket has multiple parts and may require up to 30 minutes to assemble. To give you an overview of the Basket parts, the above picture is to help you put the various parts into perspective. Please read through the instructions below to familiarise yourself with the parts and steps before assembly.
Step 2 Right Back (B) Left Back (C) Bolt (①) Washer (③) Washer (③) Nut(④) Seat (D) Align Right Back(B), Left Back(C) and Seat(D). Attach Right Back(B) and Left Back(C) to Seat(D) using Bolts(①), and Washers(③) on the upper side and Washers(③) and Nuts(④) on the lower side, with Allen Key(⑧) and Spanner(⑦). Do not fully tighten the Bolts.
Step 4 Top (A) Bolt (①) Washer(③) Washer(③) Right Back (B) Nut(④) Left Back (C) Seat (D) Align Right Back(B), Left Back(C) and Top(A). Attach Right Back(B) and Left Back(C) to Top(A) using Bolts(①), and Washers(③) on the upper side and Washers(③) and Nuts(④) on the lower side, with Allen Key(⑧) and Spanner(⑦). Do not fully tighten the Bolts.
Step 6 Pillow (E) Cushion (F) Now, tighten all Bolts and Nuts at all joints sequential manner. Place Bolt Caps(⑤) on all Bolts(①), and Bolts(②); and Nut Caps(⑥) on Nuts(④). Tie the Pillow(E) to the Basket as pictured above. Place the Cushion(F) on the Basket. Your Basket is ready for use. Step 7 Lift the Basket and hang the Iron Chain on the Spring of the Hanging Chair Base. Use the Safety Rope to lock up the middle rattan warp at the bottom of the Basket as shown above.
Page 8 OF 8 Noble House Home Furnishings LLC
Caution : You must read this before you proceed HANGING CHAIR BASE Picture Label Picture Description QTY A Base 1 B Right Tube 1 Noble House Home Furnishings LLC Page 1 OF 10
C Left Tube 1 D Middle Tube 1 E Lower Pole 1 F Upper Pole 1 Description QTY ① Hex Bolt (M8x65mm) 3 ② Hex Bolt (M8x55mm) 2 ③ Hex Bolt (M8x15mm) 6 ④ Washer (M8) 12 ⑤ Nut (M8) 4 ⑥ Cap (M8) 12 ⑦ Hanging Part 1 ⑧ Spring 1 ⑨ Safety Line(with Carabiner) 1 Label Picture Noble House Home Furnishings LLC Page 2 OF 10
⑩ Rubber Ring 1 ⑪ Spanner (M8) 2 Before Beginning Assembly: Noble House Home Furnishings LLC Page 3 OF 10
Overview Upper Pole (F) Lower Pole (E) FRONT FACING Middle Tube (D) Base (A) Right Tube (B) Left Tube (C) This Hanging Chair Base has multiple parts and may require up to 30 minutes to assemble. To give you an overview of the Hanging Chair Base parts, the above picture is to help you put the various parts into perspective. Please read through the instructions below to familiarise yourself with the parts and steps before assembly.
Step 2 Base (A) Right Tube (B) Left Tube (C) Place the Base(A), Right Tube(B) and Left Tube(C) on a clean, non-marring surface. One by one insert Right Tube(B) and Left Tube(C) into the Base(A). Step 3 Washer (④) Base Bolt (③) Side Tube (B) Attach Right Tube(B) and Left Tube(C) to Base(A) using Bolts(③) and Washers(④), with Spanner(⑪). Do not fully tighten the Bolts.
Step 4 Right Tube (B) Base (A) Middle Tube Left Tube (C) Nut (⑤) Washer (④) Washer (④) Bolt (②) Attach Right Tube(B) and Left Tube(C) to Middle Tube(D) using Bolt(②) and Washer(④) on one side, and using Washer(④) and Nut(⑤) on the other side; tighten with Spanners(⑪). Do not fully tighten the Bolts. Step 5 ① ④ ④ ⑤ Lower Pole Base (A) Insert Lower Pole(E) into Base(A), turn the Lower Pole(E) and align mounting positions.
Step 6 Lower Pole (E) Rubber Ring (⑩) Base (A) Base (A) Move the Rubber Ring(⑩) down the Lower Pole(E) until it is flush with the top of the Base(A). Step 7 Upper Pole (F) Hanging Part (⑦) Spring ( ⑧) Insert Hanging Part(⑦) into the top of Upper Pole(F). Then insert the Spring(⑧) into the Hanging Part (⑦).
Step 8 Upper Pole (F) ④ ③ Lower Pole (E) Insert the Upper Pole(F) into Lower Pole(E) and align mounting positions. Attach Upper Pole(F) to Lower Pole(E) using Bolt(③) and Washer(④) with Spanner(⑪). Now, tighten all Bolts and Nuts at all joints sequential manner. Place Caps(⑥) on Bolts and Nuts(⑤). Step 9 Safety Line (⑨) Base (A) Insert the Carabiner on the Safety Line(⑨) into the Base(A), and screw up the Carabiner. Your Hanging Chair Base is ready for use.
Step 10 Lift the Basket and hang the Iron Chain on the Spring of the Hanging Chair Base. Use the Safety Rope to lock up the middle rattan warp at the bottom of the Basket as shown above. Screw up the Carabiner to secure the Basket Note: This Step should be completed with 2 adults.
Noble House Home Furnishings LLC Page 10 OF 10