3.8 Chassis Installation Process
3.8.1 Preparation
Step 1. Review all regulations. See Mandatory Regulations.
Step 2. Assess and prepare the site and observe all safety warnings. See Site
Preparation.
3.8.2 Pre-staging
This section applies only if you are using ADP-Hm to initialize and commission the
7705 SAR-Hm or 7705 SAR-Hmc in a pre-staging facility.
To pre-stage the 7705 SAR-Hm or 7705 SAR-Hmc chassis, perform the following
steps in order:
Step 1. Unpack the chassis at the pre-staging facility. See Unpacking the Chassis.
Step 2. Install the SIM. See Installing the SIM.
Step 3. Install the chassis on a table top. See Mounting the Chassis on a Flat
Surface.
Step 4. Ground the chassis. See Grounding the Chassis.
Step 5. Connect the antenna and network cables to the chassis. See Making
Indoor Antenna Connections to the 7705 SAR-Hm and Making
Connections to the RJ-45 Ports.
Step 6. Prepare the DC input power cables and connections to the DC power feed.
See Preparing the DC Power Connections. If the HV-PS35 is used, see
High Voltage Power Supply Unit.
Step 7. Power up the system and monitor ADP-Hm. See Powering Up and
Initializing.
Step 8. Shut down all power to the router.
Step 9. Remove the power cables from the router.
Step 10. Remove the antennas and cabling from the router. Do not remove the SIM.
Note: The instructions in this guide assume that the prerequisites for the instantiation of
ADP-Hm have been completed. Refer to the 7705 SAR-Hm and 7705 SAR-Hmc Main
Configuration Guide for more information.