Step 11. Repackage the router and ship it to the installation site.
Step 12. Perform On-site Installation.
3.8.3 On-site Installation
This section applies in any the following installation scenarios:
you are using ADP-Hm and have performed the pre-staging steps
you are using ADP-Hm and are not pre-staging the router
you are not using ADP-Hm
To install the 7705 SAR-Hm or 7705 SAR-Hmc chassis on site, perform the following
steps in order:
Step 1. Assess and prepare the site. See Site Preparation.
Step 2. Unpack the chassis. See Unpacking the Chassis.
Step 3. Install the SIM. This step is not required if the router has been pre-staged.
See Pre-staging in this chapter. See also Installing the SIM.
Step 4. Install the chassis according to one of the methods described in Installing
and Grounding the Chassis.
Step 5. Ground the chassis. See Grounding the Chassis.
Step 6. Install the Main, Diversity, WiFi, and GPS antennas. See Overview or
Installing and Grounding Outdoor Antennas.
Step 7. Connect the coaxial antenna cables and the network cables to the chassis.
See Making Outdoor Antenna and Cable Connections and Making
Connections to the RJ-45 Ports.
Step 8. Prepare the DC input power cables and connections to the DC power feed.
See Preparing the DC Power Connections. If the HV-PS35 is used, see
High Voltage Power Supply Unit.
Step 9. Power up the system. See Powering Up and Initializing.