Installation Guide
Table Of Contents
- SAR-Hm and SAR-Hmc Chassis Installation Guide
- Table of Contents
- List of Tables
- List of Figures
- 1 Preface
- 2 Mandatory Regulations
- 2.1 In This Chapter
- 2.2 List of Terms
- 2.3 Safety Warnings / Avertissements de Sécurité
- 2.4 General Requirements
- 2.5 Safety Approvals
- 2.6 Safety Approval for External DC Sources That Power This Equipment
- 2.7 Canada Regulations
- 2.8 United States Regulations
- 2.9 European Union Regulations
- 2.10 United Kingdom Regulations
- 2.11 Australia/New Zealand Regulations
- 2.12 China Regulations
- 2.13 South Korea Regulations
- 2.14 Japan Regulations
- 2.15 Hazardous Locations
- 3 7705 SAR-Hm and 7705 SAR-Hmc Overview
- 3.1 In This Chapter
- 3.2 Overview of the 7705 SAR-Hm and 7705 SAR-Hmc
- 3.2.1 7705 SAR-Hm and 7705 SAR-Hmc Components
- 3.2.1.1 Chassis Features
- 3.2.1.2 Ethernet Ports
- 3.2.1.3 RSVD Port
- 3.2.1.4 RS-232 Ports
- 3.2.1.5 Console Port
- 3.2.1.6 Alarms Port
- 3.2.1.7 Main and Diversity Antenna Connectors
- 3.2.1.8 GPS Antenna Connector
- 3.2.1.9 WLAN Connector
- 3.2.1.10 Chassis Grounding
- 3.2.1.11 Power Supply Input
- 3.2.1.12 High Voltage Power Supply Unit
- 3.2.1.13 Chassis Temperature Control
- 3.2.1.14 Chassis Mounting Options
- 3.2.1 7705 SAR-Hm and 7705 SAR-Hmc Components
- 3.3 Cellular Components
- 3.4 GNSS Components
- 3.5 WLAN Components
- 3.6 Citizens Broadband Radio Service
- 3.7 ADP-Hm Prerequisites and Pre-staging Considerations
- 3.8 Chassis Installation Process
- Customer Document and Product Support
7705 SAR-Hm and 7705 SAR-Hmc Overview
80
SAR-Hm and SAR-Hmc Chassis Installation Guide
© 2022 Nokia. Nokia Confidential Information
Use subject to agreed restrictions on disclosure and use.
3HE 17810 AAAA TQZZA
Step 11. Repackage the router and ship it to the installation site.
Step 12. Perform On-site Installation.
3.8.3 On-site Installation
This section applies in any the following installation scenarios:
• you are using ADP-Hm and have performed the pre-staging steps
• you are using ADP-Hm and are not pre-staging the router
• you are not using ADP-Hm
To install the 7705 SAR-Hm or 7705 SAR-Hmc chassis on site, perform the following
steps in order:
Step 1. Assess and prepare the site. See Site Preparation.
Step 2. Unpack the chassis. See Unpacking the Chassis.
Step 3. Install the SIM. This step is not required if the router has been pre-staged.
See Pre-staging in this chapter. See also Installing the SIM.
Step 4. Install the chassis according to one of the methods described in Installing
and Grounding the Chassis.
Step 5. Ground the chassis. See Grounding the Chassis.
Step 6. Install the Main, Diversity, WiFi, and GPS antennas. See Overview or
Installing and Grounding Outdoor Antennas.
Step 7. Connect the coaxial antenna cables and the network cables to the chassis.
See Making Outdoor Antenna and Cable Connections and Making
Connections to the RJ-45 Ports.
Step 8. Prepare the DC input power cables and connections to the DC power feed.
See Preparing the DC Power Connections. If the HV-PS35 is used, see
High Voltage Power Supply Unit.
Step 9. Power up the system. See Powering Up and Initializing.