Instruction Manual

18
Figure 18: Cable Configurations: C03, C11, C12 and C18
6. Run cable C11 to the rear of the sprayer, in the vicinity of the valve block.
7. Connect the 6-pin shroud on C12 to T6 on C11.
8. Route the free end of C12 to the existing left and right boom control valve block.
9. Unplug the connectors on the existing valves. There are 4 connectors to unplug (as labeled
on the valve bank): LEFT UP, LEFT DOWN, RIGHT UP and RIGHT DOWN. Plug the 2-pin
receptacles of C12 to the matching existing valve connections. For each connector, the
function (e.g. “LEFT UP”, etc.) is labeled on the branch wire.
10. Connect the 2-pin tees (labeled “MAIN UP” and “MAIN DOWN” on the branch wires) of
C12 to the matching tees of C18.
11. Route the free end of C18 to the existing main control valve block.
12. Insert the 2-pin tees of C18 between the matching main control valve connections.
13. Connect the valve interface cable (C03) to connector S6 on the valve extension cable
(C11).
14. Connect the 2-pin connectors on the valve interface cable to the NORAC valve block, as
shown in Figure 19.
15. The connectors on the valve cable (C03) are marked RIGHT UP, LEFT UP, RIGHT
DOWN and LEFT DOWN. Cables labeled with UP go on the same side as the
hydraulic hoses.