Manual

25
9.2 Valve Assembly
1. On a clean surface remove the plastic plugs from the block.
2. Install the 6MB-6MOR (F02) fittings into the “P” and “T” ports. Tighten to 18 ft-lbs (24
Nm).
3. Install the 6MB-6MOR (F02) fittings into the “A” and “B” ports of the two stations closest
to the “P” and “T” ports. Tighten to 18 ft-lbs (24 Nm).
4. Install the orifice (F08) and the 6MB 6MOR fitting (F05) into the “B” port of the 3
rd
station
(furthest from the “P” and “T” ports) of the block.
5. Install the 6MBP plug (F09) into the “A” port of the 3
rd
station of the block.
6. Install the orifice (F10) into the “A” port of the expansion block with the notch facing in.
7. Install the orifice (F11) into the “B” port of the expansion block with the notch facing in.
8. Install the 6MB-6MOR (F13) fittings into the “A” and “B” ports of the expansion block.
Tighten to 18 ft-lbs (24 Nm).
Figure 25: NORAC Valve Block Details