User guide

4-2 Operation
Alternatively, the system can be programmed to move the part directly to a downstream machine or onto
an unloader. Another part is loaded into the Dispense Zone and clamped in place. Dispensing on the
second part begins. A third part is loaded into the Pre-dispense Zone.
The part is heated (if Post-dispense Zone is present).
If so programmed, the part heaters for the Post-dispense Zone heat the part to a pre-programmed
temperature.
The part exits the system.
When the part is ready to exit the system, the lift table releases the part and it is conveyed out of the
system. SMEMA handshaking occurs with the downstream machine to determine whether it is ready to
accept the part.