Manual

10-2 Running Production
4. Follow the on-screen prompts.
5. Once you have completed a Prompted Setup, click on Load in the Production
Window.
6. Select multipas.fmw from the file list and click on OK.
> A dialog box opens telling you that FMW is “Downloading
<filename>…please wait.”
7. After the file has loaded, click on Run in the Production Window.
8. Click on Run Production.
> The Run Window opens. See Figure 10-1.
> A message box appears requesting you to “Clear the conveyor”.
9. Clear the conveyor.
10. Click on OK.
11. Place a Tutorial Board at the mouth of the conveyor.
12. Click on Go.
> The message “Waiting for a board” will appear.
> The Tutorial Board will be conveyed into the dispensing area. Stop pins will
raise to stop the board at the Dispense Zone. Lifter tables or bar clamps will
clamp the part in place. Dispensing will be performed.