Instruction Manual
Installation and Setup 3-1
3 Installation and Setup
3.1 Overview
This section describes installation procedures for the MH-900. See the manual for your particular
dispensing system for dispensing system installation instructions. This section covers the following topics:
•
Uncrating and Placing the MH-900
•
Magazine and Part Setup
•
Installing the Light Beacon
•
Motion System Setup
• Aligning and Leveling the MH-900 to
Connected Equipment
• Conveyor Setup
• Installing the Cables • Jog Setup
• Connecting to the Facility Air Supply • System Setup
• Anchoring the MH-900 • Preferences
• Configuration Menu • Optional Conveyor Configuration for Long
Carriers
• Hardware Setup
3.2 Safety First
Operation of your MH-900 involves mechanical devices, air pressure, and electrical power. It is essential
that every person servicing or operating the MH-900 fully understands all hazards, risks, and safety
precautions. When properly operated and maintained, the MH-900 should be safe and reliable.
Thoroughly review Section 2 - Safety prior to installation and operation.
3.3 Uncrating and Placing the MH-900
To uncrate and place the MH-900:
1. Check the “ShockWatch” devices, located on the outside of the shipping crate, to make
sure that it has not been dropped. If any of these devices has been activated, contact
Nordson ASYMTEK Technical Support.
2. Locate and remove the envelope on the outside of the shipping crate. Open the envelope
and locate the shipping list.
WARNING! Personnel should wear gloves and safety glasses while removing the top and
sides of the crate. Sufficient personnel should be used to properly lift and control
the crate top and sides in order to prevent serious injury to personnel or damage to
the dispensing system.
3. Remove all packaging material from the perimeter of the MH-900.
4. Use a wrench to remove the bolts that anchor the MH-900 to the floor of the crate.
5. Use a forklift to gently lift the MH-900 off of the pallet.
6. Place in the desired location.
7. Open the magazine loading area and remove all the tie wraps from the shuttle and
gripper/pusher actuators.