Instruction Manual
3-4 Installation and Setup
3.6 Installing the Cables
Tools and Materials Needed:
• Main Power Cable(s)
• SMEMA Cable(s)
• Bypass Plug(s)
WARNING! Use extreme caution when working around high voltage components. Make sure
the Main Power Switch is turned OFF (0) before connecting any cables.
To install the cables on Loader and/or Unloader:
Attach SMEMA cables and bypass plug according to the diagrams and table below.
Loader/Unloader:
Unloader S-900 Dispenser Loader
Same Side Loader
S-900 Dispenser Same Side Loader
Item Cable Part Number Dispenser Connector MH-900 Connector
1 Upstream SMEMA Cable 06-2142-00 CV1 Upstream Loader SMEMA 1
2 Downstream SMEMA Cable 06-2141-00 CV1 Downstream Unloader SMEMA 1
3 Power Cable 56-0300 N/A Power Inlet
4 Bypass Plug 7222050 N/A Dispenser I/O
5 Downstream SMEMA Cable 06-2141-00 CV2 Downstream Unloader SMEMA 2
6 Upstream SMEMA Cable 06-2142-00 CV2 Upstream Loader SMEMA 2
Figure 3-3 Installing Cables
2
5
4
1
3
6
1
2
3
4
5
6
3
4