Instruction Manual
Table of Contents iii
Table of Contents
1 Introduction ...................................................................................................................................... 1-1
1.1 Overview ............................................................................................................................... 1-1
1.2 Safety First ............................................................................................................................ 1-1
1.3 Basic System Description ..................................................................................................... 1-1
1.3.1 Loadermove Touchâ„¢ Software and Control System ............................................... 1-1
1.4 System Configuration ............................................................................................................ 1-2
1.5 System Features ................................................................................................................... 1-2
1.5.1 MH-912L Loader and MH-912S Same-Side Feed Loader/Unloader ....................... 1-2
1.5.2 MH-912U Unloader .................................................................................................. 1-6
1.6 Control Panel ......................................................................................................................... 1-9
2 Safety ................................................................................................................................................. 2-1
2.1 Overview ............................................................................................................................... 2-1
2.2 Equipment Usage .................................................................................................................. 2-1
2.2.1 Intended Use ............................................................................................................ 2-1
2.2.2 Misuse ...................................................................................................................... 2-1
2.3 Basic Safety Precautions and Practices ............................................................................... 2-2
2.3.1 Safety of Personnel .................................................................................................. 2-2
2.3.2 Material Safety ......................................................................................................... 2-3
2.3.3 Preventing Dispensing System and Workpiece Damage ........................................ 2-3
2.4 Disposal ................................................................................................................................. 2-3
2.5 Earthquake Precautions ........................................................................................................ 2-3
2.6 Safety Warning Labels .......................................................................................................... 2-4
2.7 Residual Safety Risks ........................................................................................................... 2-7
2.8 Emergency Shutdown ........................................................................................................... 2-8
2.8.1 Emergency Shutdown Situations ............................................................................. 2-8
2.8.2 Emergency Shutdown Recovery .............................................................................. 2-8
2.9 Integrated Safety Systems .................................................................................................... 2-9
2.9.1 Safety Interlock System ........................................................................................... 2-9
2.9.2 Light Beacon ............................................................................................................ 2-9
2.10 Service Shutdown ............................................................................................................... 2-10
2.11 Lockout/Tagout of Electrical and Pneumatic Energy .......................................................... 2-10
2.12 Decommissioning Procedures ............................................................................................ 2-11
3 Installation and Setup ...................................................................................................................... 3-1
3.1 Overview ............................................................................................................................... 3-1
3.2 Safety First ............................................................................................................................ 3-1
3.3 Uncrating and Placing the MH-900 ....................................................................................... 3-1
3.4 Installing the Light Beacon .................................................................................................... 3-2
3.5 Aligning and Leveling the MH-900 to Connected Equipment ............................................... 3-3
3.6 Installing the Cables .............................................................................................................. 3-4