Instruction Manual
4-20 Operation
4.10 Running Production
To start a production run:
1. Startup the MH-900 as described in 4.5.1 Startup.
2. Make sure that the connected dispensing system is on and that the dispensing system light
beacon displays a green light.
3. From the Loadermove Touch Main Window (Figure 3-17), press Run
.
The Production Window (Figure 4-23) opens.
Figure 4-23 Production Window
4. Select Run
.
The Run Window (Figure 4-24/Figure 4-25) opens.
Figure 4-24 Run Window – Loader