User Manual
Installation 3-1
3 Installation
3.1 Overview
This section describes installation procedures for the Select Coat SL-940E/SL-941E Series Conformal
Coating System and covers the following topics:
• Uncrating and Placing the Coating System
• Unpacking the Coating Area
• Leveling the Coating System
• Installing the Light Beacon
• Installing the Laptop Computer
• Installing the Optional Genie Camera
• Anchoring the Coating System
3.2 Safety First
Operation of your SL-940E/SL-941E Series Conformal Coating System involves heat, air pressure,
electrical power, mechanical devices, and the use of hazardous materials. It is essential that every person
servicing or operating the coating system fully understands all hazards, risks, and safety precautions.
Refer to Section 2 - Safety for additional information.
WARNING! CAUTION!
To ensure optimal performance and safety, it is necessary to install the coating
system in a facility that meets the necessary requirements listed in Section 10 -
Specifications. If you have any questions, please contact Nordson ASYMTEK
Technical Support.
3.3 Uncrating and Placing the Coating System
Tools and Materials Needed:
•
1/2 inch wrench •
Band Cutter
•
9/16 inch wrench
•
Phillips Screwdriver (included in tool kit)
•
Personal Protective Equipment
•
1 ½-inch wrench (included in tool kit)
•
Hammer
•
Forklift
•
Flat Bar
•
Level
WARNING! CAUTION!
Installation procedures should only be performed by a trained service technician.