User Manual
Power-up and Testing 4-3
4.6 Connecting Power and Air Supply
WARNING! CAUTION!
Make sure that your facility meets all requirements listed in Section 10 -
Specifications. Failure to meet these requirements could result in serious bodily
injury to personnel and damage to the coating system.
CAUTION! This procedure should only be performed by a trained service technician.
Tools and Materials Needed:
• Main Power Cable
• Quick Release Air Hose Nozzle
To connect the facilities power and air supply:
CAUTION! Switch the Main Circuit Breaker to the OFF (0) position before proceeding.
1. Unpack the main power cable and remove all packing material including plastic wrappers
and tie wraps.
2. Plug the female end of the power cable into the main power inlet on the lower left side of
the coating system. Plug the male end of the power cable into the facility power source
(Figure 4-1).
3. Locate and attach the quick disconnect air nozzle to the facility air hose.
4. Connect the facility air hose to the main air inlet connector on the back right side of the
coating system.
5. Connect the facility exhaust ventilation system ductwork to the exhaust vent duct
(Figure 4-1).
6. Adjust airflow to a minimum of 600 scfm with the front door closed.