User Manual
Power-up and Testing 4-5
4.7 Powering On the System
To power on the coating system:
1. Verify that the main power cord is connected to the main power inlet and the facility
power source (Figure 4-1).
2. Verify that the facility air hose is connected to the main air inlet (Figure 4-1).
3. Verify that the facility exhaust ventilation system ductwork is connected to the Exhaust
Vent Duct (Figure 4-1).
4. Turn the main circuit breaker to the
ON (I) position (Figure 4-1).
5. Check the EMO buttons to see if they have been activated. If one has been activated,
deactivate it by turning the red knob clockwise until the knob pops out (Figure 4-2).
6. Make sure the interlock signal is not interrupted. Close the coating system hood if
applicable.
7. Verify the spill pan in the lower front cabinet is all the way in (Figure 1-7).
8. Turn the laptop computer power button
ON (I).
9. Press the
ON (l) button on the front panel (Figure 4-2).
NOTE During power up, the green start button on the front panel will blink. The
coating system will turn on after an approximate 60-second vent air time
delay to ventilate any solvents in the dispense area. When the system is ready,
the green start button will display a solid light and the light beacon will be
green.
The coating system should be in a powered-up state.
The system computer should begin the boot up sequence.
Item Description
1 Start Button
2 Stop Button
3 EMO
Figure 4-2 Front Panel Buttons
1
2
3