Installation Guide
19
Step
Installation Procedure(ex. @Garage)
Necessary Tool
18
Pull
"
⑦Flex Sleeve
"
over
"
③Flex Pipe 2"
"
under the ceiling. Then, push into the bottom of
"
⑥Base Junction Support
"
. And check that
"
③Flex Pipe 2"
"
is sticking out from
"
⑦Flex
Sleeve
"
. (If it is not sticking out,cut
"
⑦Flex Sleeve
"
until
"
③Flex Pipe 2"
"
sticks out.)
Flex Sleeve
Do not extend the "⑦Flex Sleeve" if it needs to be cut, it should be cut while in its
compressed state.
19
Firmly tighten "⑥B. Flex Sleeve Clamp" of "⑥Base Junction Support", but be careful
not to tighten too much as it may distort the "⑦Flex Sleeve" and rubber. Check to see if
it is firmly fixed by pulling it by hand.
The tightening torque shall be between 7 and 10 in lb.
Step-3
(Work where equipment is installed)
Pay attention not to get injured from the sharp edge of "⑦Flex Sleeve".
WARNING
OK
NG
Flat head
Screwdriver
Box wrench
(5/16")
or
Point
"
③
Flex Pipe 2"" not visible.
Point
"
③
Flex Pipe 2"" is visible.