Use and Care Manual

NORITZ AMERICA CORPORATION
11160 Grace Avenue, Fountain Valley, CA 92708 Tel. 1-866-7NORITZ www.noritz.com
Combination Boiler Primary/Secondary Manifold Kit
Part# MK-CB-1
Compatible with Model CB180 or CB199
Save installation time and cost with a pre-fabricated manifold kit.
Optimize hydronic and radiant heating performance and overall efficiency.
Features:
Made with type L copper tubing.
1” FNPT dielectric unions for Boiler Supply and Return.
3/4“ FPT with plug for heating accessories.
1” isolation valves and 3/4“ connection purge ports.
1-1/2” sweat connections on supply and return pipe.
Example Illustration
Expansion Tank
& Air Separator
Heating
Supply
Heating
Return
Pump
S
R
Feed
H
C
Domestic Cold Water
Domestic Hot Water
Heating Makeup Feed Water

Summary of content (2 pages)