Installation Manual

10-10
Page 20
2008-12-03
1.2.2. Mounting Process
Figure 1. Mounting Process – Step 1
Align the water tub to the centre of the duct, then use a level check water tub to the duct
lengthwise and crosswise. Shim the tank as required until it is level.
Note: Install four self-tapping screws 1/4 UNC x 3/4" on each side of the tub to secure it in
place.