Communication Server Large System Installation and Commissioning
Page 100 of 456 Installing DC power
NN43021-310 Standard 02.01 December 2007
Large Candeo sample configurations
Example configuration #1
• 1.05 m (42 in.) Frame with battery kit, LVD and distribution 500 (with
20 breaker positions).
• 17 mid trip breakers (30 A), one GMTX fuse block (takes up 3 breaker
positions).
• System monitor.
• Up to 10 rectifiers (500 A capacity).
Example configuration #2
• 1.05 m (42 in.) Frame with battery kit, LVD and distribution 500 (with
20 breaker positions). 17 mid trip breakers (30 A), one GMTX fuse block
(takes up 3 breaker positions).
• Additional distribution 500 (with 20 breaker positions). 11 mid trip
breakers (30 A), three GMTX fuse blocks (takes up 3 breaker positions
per block).
• System monitor.
• Up to 6 rectifiers (300 A capacity).
Example configuration #3
• 2.1 m (84 in.) Frame with battery kit, LVD and distribution 500 (with 20
breaker positions). 20 mid trip breakers (30 A).
• Second 2.1m (84in.) Frame with battery kit, LVD and distribution 500
(with 20 breaker positions). 11 mid trip breakers (30 A), three GMTX
fuse blocks (takes up 3 breaker positions per block).
• Additional distribution 500 (with 20 breaker positions), 10 mid trip
breakers (30 A).
• System monitor.
• Up to 10 rectifiers (500 A capacity) in frame one, up to 10 rectifiers
(500 A capacity) in frame two.
• One interframe DC link bar kit.