Planning and designating a
Main Distribution Frame
Contents
This section contains information on the following topics:
About terminations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133
Installation and designation. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 133
Terminal block requirements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 134
Installing the BIX cross-connect terminal. . . . . . . . . . . . . . . . . . . . . . . 134
Installing the Krone cross-connect system (UK) . . . . . . . . . . . . . . . . . 138
About terminations
All Large System terminations are cross-connected on frame-mounted or
wall-mounted modules and connecting blocks. The layout of the blocks can
vary to meet the requirements of the site.
Installation and designation
Refer to the manufacturer's documentation for recommendations and detailed
procedures on installing and labelling the cross-connect blocks.
DANGER OF ELECTRIC SHOCK
Tip, ring, A, B, E, M, ESC, and ESCG connections
can be considered to be Telecommunication Network
Voltages (TNV).