Communication Server Large System Installation and Commissioning
Page 160 of 456 Configuring the system monitor
NN43021-310 Standard 02.01 December 2007
Figure 65
Cabling CS 1000M SG or Meridian 1 PBX 61C, single column with
stacked Core/Net modules – cable master system monitor to SDI port
5 Daisy-chain slave system monitors to the master.
a. For a single-column system, skip this step.
b. For a multiple-column system, beginning with the master system
monitor, cable in series (slave 1 to slave 2, slave 2 to slave 3, and so
on) from connector J6 to connector J5 on each system monitor (see
Figure 66 on page 161). Terminate at connector J5 on the last
column.
— If columns are adjacent, use an NT8D46AL cable.
— If columns are not adjacent, use an NT8D46AP cable.
553-3111
NT8D46AA
J1
To SDI port To next module
Backplane
CPU 0
To system monitor/
power supply assembly
in the pedestal
J2
NT8D46AG