Figure 66
Multiple-column system monitor connections
6 For PFTU or external alarm cabling, connect a system monitor to MDF
cable.
Connect a system monitor to MDF cable to connector J3 on the
master system monitor.
Connect the cable at the alarm termination area at the MDF. See
Table 12 for the terminating sequence.
J3 J5
J6
J4
J3 J5
J6
J4
Column 0
Master system monitor
Slave unit n
Slave unit 1
From J6 of previous
system monitor
(NT8D46AL/AP cable)
To J5 of next
slave system monitor
(NT8D46AL/AP cable)
553-3114
J3 J5
J6
J4
From J6
on master
To J5
on slave 1
Terminate on J5
of last column in series
From J6 to
J5 on slave 2
NT8D46BH alarm cable
to MDF
Cable to external
power equipment
J3 J5
J6
J4