Communication Server Large System Installation and Commissioning
Powering up the system and initial loading Page 333 of 456
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Procedure 58
Testing Core/Net 0
From Core/Net 0, perform these tests:
1 Perform a redundancy sanity test:
2 Check the LCD states:
a. Perform a visual check of the LCDs.
b. Test LCDs:
3 Test the System Utility cards and the cCNI cards:
4 Test system redundancy:
5 Install the two system monitors. Test that the system monitors are
working:
LD 135 Load program
STAT CPU Get status of CPU and memory
TEST CPU Test CPU
LD 135 Load program
TEST LCDs Test LCDs
DSPL ALL
LD 135 Load program
STAT SUTL Get the status of the System Utility card
TEST SUTL Test the System Utility card
STAT CNI c s Get status of cCNI cards (core, slot)
TEST CNI c s Test cCNI (core, slot)
LD 137 Load program
TEST RDUN Test redundancy
DATA RDUN Test database integrity
STAT FMD Status of one or both Fixed Media Devices
(FMD)
STAT RMD Status of one or both Removable Media Devices
(RMD)
LD 37 Load program
ENL TTY x Enable the XMS, where x= system XMS