Installing earthquake bracing Page 355 of 456
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
Figure 121
Installing bracing rods for column support
4 Reinstall the top cap and grills:
• Position each top cap and install the bolts that secure it.
• Replace the air exhaust grills at the front and rear of each top cap.
5 For a single-column system, reinstall the side panels on each module.
Tie bars
Earthquake rods
Rods screw
into pedestal
553-3063
Rods in slots between
modules and
exterior side panels
Side panel