Communication Server Large System Installation and Commissioning

Index Page 451 of 456
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
F
field wiring kits and terminals
PDU connections, 121
floor drilling for anchor bolts, 347
floor plans, 62
fourth modules, 65
G
gaskets
bracing rod installation, 356
spacer kits, 72
GFCI (ground fault circuit interrupt) devices, 77
global PDU, 94
grills, 63
ground/protective earth
AC power, 78, 82
DC power, 109, 123
UPS, 85
ground start feature, 149
I
IG (isolated ground) bus, 78
IG-L6-30 receptacles, 77
installing
QUA6 PFTU (UK), 150
insulated ground wire, 124
I/O panels
backplane connections, 262, 263
IPE module connections, 265
superloop cabling, 257, 259, 260
system terminal connections, 171
IPE modules
backplane slots, 138
cable connections, 261, 265
line pair-termination tables, 267
placement, 54
superloop cabling, 252, 256
trunk pair-termination tables, 267, 269
K
Krone cross connect system (UK), 138
L
L6-20 receptacles, 77
L6-30 receptacles, 77
labels
Krone cross connect system, 140
ladder racks, 89
LD 37 program
module additions, 365, 368, 370, 373, 374, 382
system terminal tests, 340
LED (light-emitting diodes)
blower unit acceptance tests, 337
power supply acceptance tests, 336
sysload acceptance tests, 339
leveling
earthquake bracing, 357
equipment, 71
lines
cabling, 261
connecting, 266
pair-termination tables, 266
terminal numbers, 266
line transfer switches, 341
locking latches, 63
logic return wiring
AC power, 78, 82
DC power, 109
LRE (logic return equalizers), 79, 84
M
master switch settings, system monitor, 154
MDF (modular distribution frames), 133
backplane cable expansion, 138
I/O panel connections, 263
PFTU cross-connections, 148
PFTU terminations, 146
system monitor cabling, 161