Communication Server Large System Installation and Commissioning
Index Page 453 of 456
Communication Server 1000M and Meridian 1 Large System Installation and Commissioning
NT8D37 IPE Modules
backplane slots, 138
cable connections, 262, 265
line pair-termination tables, 266
superloop cabling, 252, 256
trunk pair-termination tables, 266, 269
NT8D46AD cable, 159
NT8D46AJ cable, 163
NT8D46AL cable, 160
NT8D46AP cable, 160
NT8D46AQ cable, 163
NT8D46AS cable, 159
NT8D46AU cable, 163
NT8D46AV cable, 164, 165
NT8D46BH cable, 162
NT8D46BV cable, 164
NT8D46 cable, 182, 183
NT8D46CV cable, 164
NT8D46DH cable, 162
NT8D46EH cable, 162
NT8D49AA Spacer Kits, 356, 357
NT8D49 Spacer Kits, 72
NT8D52 Blower Units, 337
NT8D63 Overhead Cable Tray Kits, 89
NT8D64BD seismic bracing kits, 345
NT8D64BE seismic anchor kits, 346
NT8D64CA seismic bracing kits, 345
NT8D64CB seismic bracing kits, 345
NT8D64CC seismic bracing kits, 345
NT8D64CD seismic bracing kits, 345
NT8D64CE seismic bracing kits, 346
NT8D84 cable, 184
NT8D88AD cable, 257
NT8D91 cable, 253
NT8D92 cable, 257
NT8D95 cable
modem cabling, 182, 184
system terminal cabling, 174, 175, 177
NT8D98 cable, 257
NT9D19 Call Processing Card, 172
O
option 21A, 77
option 61
system terminals, 172
option 71
system terminals, 172
option switches
system monitor, 153
Overhead Cable Tray Kits, 89
OVL messages, 340
P
P069985 Top Cap Cable Egress Panel, 89
pair-termination tables, 266
PDU (power distribution unit), 94
equipment layout, 121
power to, 125
safety ground, 122
system monitor cabling, 157
PE (Peripheral Equipment)
trunk pair-termination tables, 267
PE (Peripheral Equipment) modules
line pair-termination tables, 267
pedestals, 38
grills, 63
module additions, 365, 366
power, 118
PFTU (power fail transfer unit), 145
acceptance tests, 341
alarm connections, 146
system monitor cabling, 161
trunk and telephone connections, 149