User Manual

1-10 CTR 28 GHz Release 1.2
411- 1333 - 203.01.02 Preliminary March 1999
Installing the CTR 28 GHz
Installation involves three separate operations:
mounting bracket assembly
installing the tower equipment
installing the indoor equipment
For information about installing the antenna(s) and such aspects as line of
sight, antenna mast spacing, coverage angle, etc., refer to the Network
Engineering Package and the Design Document.
Mounting Bracket Assembly
It is recommended that you assemble the mounting brackets on the ground
prior to mounting them on the pole. See Figures 1-7, 1-8, and 1-9.
Tools
You require the following tools to assemble the brackets:
i. Allen Key
ii. two open ended wrenches or a wrench and a socket
Steps
i Bolt the two side supports onto either side of the ‘U bracket support.
ii Align the holes in the U bracket with the holes in the ‘base support. Ensure that the
flat surface of the base support is in the upward position, while the curved/concave
surface faces downward.
iii Bolt the assembled U bracket support to the narrow end of the ‘base support.
iv Position the assembled pole mounting hardware on the mounting pole at the point
you want to mount the CTR.
v Bolt the assembled mounting hardware to the two saddle brackets using the supplied
6
" threaded bolts. Ensure that the bracket is securely tighten and correctly
positioned on the mounting pole before attaching the radio.