Server User's Manual

Table Of Contents
Installing MG 1000B Hardware 253
—End—
The preceding steps enable users to upgrade the system one MG 1000B at
a time. For each additional IPMG, repeat Procedure 3 (Removing the SSC
card) to Procedure 5 (Installing the CP PM card).
Nortel Communication Server 1000
Branch Office Installation and Commissioning
NN43001-314 01.02 Standard
Release 5.0 20 June 2007
Copyright © 2007, Nortel Networks
.