PTO Generator Trailer ITEM # 165959 For use on 13000, 27500, and 60000 PTOG North Star Generators or Other PTO Generators up to 60kW.
THANK YOU Thank you for purchasing a NorthStar PTO Trailer. Your trailer is designed for long life, dependability, and the top performance you demand. Please take time now to read through this manual so you can better understand the machine’s operation and safety precautions. Everyone who uses this trailer must read and understand this manual. Enjoy the exceptional performance of your NorthStar PTO Trailer.
STEP 1 • Open hardware bag and separate the components. FASTENERS (actual size) 1/2-13 X 1.25” Long Hex Head Bolt Qty. 8 1/2-20 X 1.25” Long Carriage Bolt Qty. 2 1/2” Flat Washer Qty. 18 3/8” Flat Washer Qty. 6 3/8-16 Hex Nut Qty. 2 1/2-13 Ny-Loc Nut Qty. 10 3/8-16 Ny-Loc Wing Nut Qty. 6 MISCELLANEOUS COMPONENTS (not actual size) Lug Bolts Qty. 10 Red Reflector Qty. 2 Hitch Pin with Chain and Lynch Pin Qty. 1 PTO Implement Shaft Retainer Qty. 2 Cord Hooks Qty. 2 3 Amber Reflector Qty.
STEP 2 • Remove remaining components from the box. Discard unpainted shipping bracket. Place trailer Base on two supports at least twelve(12) inches high. 00673 STEP 3 • Bolt the Axle to the Base with (6) 1/2”-13 x 1.25 hex head bolts, (12) 1/2” flat washers, and (6) 1/2-13 Ny-Loc nuts.
STEP 4 • Assemble Tongue Arm to Base with (2) 1/2-13 X 1.25” hex head bolts, (4) 1/2 Flat Washers, and (2) 1/2-13 Ny-Loc Nuts. Assemble Tongue to Tongue Arm with (2) 1/2-13 X 1.25 Carriage bolts, (2) 1/2 flat washers, and (2) 1/2-13 Ny-Loc nuts. Note: The Tongue Arm and Tongue is adjustable to fit many different PTO Generators and PTO Implement Shafts. You may need to adjust the Tongue to fit your implement shaft.
STEP 6 • Apply the (2) red reflectors to the rear of the trailer and (2) amber reflectors to front sides of the trailer as shown. Assemble the (2) cord hooks to the trailer with (2) 3/8-16 hex nuts, (2) 3/8 flat washers, and (2) 3/816 Ny-Loc wing nuts. Assemble the (2) PTO Implement shaft retainer to the trailer with (4) 3/8 flat washers, and (4) 3/8-16 Ny-Loc wing nuts. Discard any remaining fasteners.
Maintenance Item Bearings Seals Spindle Nut Wheel Nuts Function Required Inspect for wear, clean and repack Inspect for leakage, Replace in worn Check torque value and tightness Check torque value 3 Months or 1000 Miles 12 Months or 6000 Miles • • • • Ultra Pack Hub Lubrication This hub has the Ultra Pack lubrication system included. The bearings can be periodically lubricated without removing the hub from the spindle. Step 1: Remove the rubber dust cap plug.
Exploded View – Rev.
This page has intentionally been left blank.
WARNING: This product can expose you to chemicals including gasoline engine exhaust, which is known to the State of California to cause cancer, and carbon monoxide, which is known to the State of California to cause birth defects or other reproductive harm. For more information go to www.P65Warnings.ca.gov. Manufactured by Northern Tool + Equipment Co., Inc. Burnsville, MN 55306 NorthernTool.