Installation Instructions

2.3.5 Connect the power cable to the “CU outlet” on the power DIN Rail
and to the CU power port.
This will automatically power on the control unit
2.3.6 Anchor power cord to prevent unwanted disconnection.
2.3.7 In conjunction with NoTraffic onsite team
2.3.7.1 Test CU wifi connectivity
2.3.7.2 Test connectivity between traffic controller and NoTraffic control unit
3 Sensor Unit Installation
(Repeat for each sensor unit)
3.1 Astro-Brac mounting
3.1.1 Recommended location for installation is in the center of the
approach on the highest point available, total height including
Astro-Brac should be 30 feet or more.
7