Installation Instructions
21
Plywood reinforcement header
Window frame
A continuous housewrap or a
waterproof membrane tucked
under housewrap
Aluminum or steel flashing
If you do not have a full brick above the opening, cutting
will be required (see detail beside). Cut the starter strip as
well so you have a level line to install the bricks. Installing
a soldier course is a very attractive alternative to horizontal
cuts (see soldier course installation section).
This page shows the installation of a horizontal course above openings. Install
a 3/4” (19mm) thick plywood reinforcement header sized according to the
header reinforcement section. Cover this header with a housewrap or a water-
proof membrane.
• Install aluminum or steel flashing above opening.
• Cover plywood and metalic flashing with a waterproof
membrane or housewrap.
• Locate the “V” mark on the starter strip flange, cut with
a utility knife and snap it off.
• Install and level your starter strip above the opening.
• Locate the screw point location on the starter strip and
fasten with #8 or #10 x 2 ½” (64mm) corrosion resistant
screws at every 16” (400mm) c/c.
• Install and screw each Novabrik on the Starter Strip with
a #8 or #10 x 2½ (64mm) corrosion resistant screw at
every 16” (400mm) c/c.
Installation Above Openings
Starter Strip