Installation Instructions

11
2”
(51mm)
30°
90º Exterior Corner
Step 2
• Install 1” x 4” (19mm x 89mm) furring strips over the
corner of the house.
• Use 1” x 6” (19mm x 140mm) furring strips if installing
over rigid insulation.
• Plumb corners and fasten corner strip.
• Fasten corner strip with # 8 or # 10 corrosion resistant
screws at 10” (250mm) c/c, in a staggering pattern.
Step 3
• Slide down the first corner block and align with the
bottom of the first course of Novabrik.
• Holding the corner block firmly in place, screw it into
the steel corner strip with one 2½” (64mm) #8 or #10
corrosion resistant screw. Make sure the block does
not slip.
Apply a small amount of construction adhesive in
between each block to lock them together.
Step 1
Pre-drill a hole at a 30° downward angle in the notch of each
corner block before installation.