Installation Instructions

26
.syawowtnienodebnacsroodroswodniwdaehdnuorrevokirbavoNgnillatsnI
A horizontal course or a soldier course forming an arch. Arches can only be
achieved over openings with a large radius.
In both cases, flashing around the opening is very important. Good quality
materials and attention to details are critical.
Flashing
Cut Novabrik to follow
window frame
House wrap overlapping
flashing
Plywood reinforcement
header
Installation on Rounded Openings
Horizontal Coursing
• Fasten a 3/4” (19mm) thick plywood header
over the opening (size according to the
header chart).
• Install aluminum flashing around opening.
• Cover plywood and flashing with a waterproof
membrane.
• Cut Novabrik using a grinder with a 4”
(100mm) masonry blade to follow the
contour of the opening.
Apply sealant between the window frame
and aluminum flashing.
Caulking
House wrap over the top
edge of membrane