User's Manual
9
Installation Expectations
• All cable runs must be secured, neat, and professional.
• Video integration should not affect or degrade customer’s existing video signal.
• RF Antenna should be placed at least 7’ above the ground.
• Playmakers should respond fast in the main playing area.
• Contact the Call Center per service release expectations.
• Complete post-installation/sign-off checklist: include signature by an authorized site
representative, preferably management.
• Insure facility is left in clean condition, to the satisfaction of the customer.
Installation Procedures
PC Location:
• Identify the PC location as indicated on the work order.
• Identify the power source and open Ethernet port dedicated for the NTN system.
• It is critical to locate the PC in close proximity to the play area for optimal system
performance.
• PC location should be well ventilated.
• Always leave the keyboard attached to the computer to enable future maintenance
procedures.
Power Source:
• Do not put the power source on the same circuit as any motorized units, as it will create
power surge when motors are activated.
• Avoid circuits controlled by wall switches.
• Advised the customer the NTN computer and RCST must always have power.
Component functionality check:
• Gather & confirm all components are onsite.
• Boot up and test PC for functionality, using a portable color monitor (required tool).
• Plug in Chargers and initiate charging all Playmakers®
• Verify no pre-existing video distribution problems are present