Installation Guide
INSTALLATION INSTRUCTIONS
READ & SAVE THESE INSTRUCTIONS!
C
TYPICAL INSTALLATION
All tubing connections are made using NuT
one Model 379
Solvent
Cement. If required, the muffler may be installed in a
vertical position with the use of ells.
Product specifications subject to change without notice.
4820 Red Bank Road, Cincinnati, Ohio 45227
Printed in U.S.A., Rev. 3/02, Part No. 65612
CENTRAL
CLEANING SYSTEM
EXHAUST OUTLET
OUTSIDE
WALL
WALL
CAP
RUBBER HOSE
PVC PIPE
STOP
COUPLING
PVC PIPE 2"
INTAKE
CLAMP (2)
(IF REQUIRED)
PVC PIPE 2"
MUFFLER
INSTALLATION INSTRUCTIONS
READ & SAVE THESE INSTRUCTIONS!
C
TYPICAL INSTALLATION
All tubing connections are made using NuT
one Model 379
Solvent
Cement. If required, the muffler may be installed in a
vertical position with the use of ells.
Product specifications subject to change without notice.
4820 Red Bank Road, Cincinnati, Ohio 45227
Printed in U.S.A., Rev. 3/02, Part No. 65612
CENTRAL
CLEANING SYSTEM
EXHAUST OUTLET
OUTSIDE
WALL
WALL
CAP
RUBBER HOSE
PVC PIPE
STOP
COUPLING
PVC PIPE 2"
INTAKE
CLAMP (2)
(IF REQUIRED)
PVC PIPE 2"
MUFFLER