FLOATING CANOPY TRACK HEAD INSTALLATION 1. Place frack head in desired position and insert top of ack head connector into frack. 2, Rotate connector 90F until frack head locks into place on frack, (See illustration D). IMPORTANT: If connector does not tum freely, do not force instead, cumin opposite direction. 4. To reposition o remove track head, pull dawn on the connector and rotate 90° m CAUTION: Refer to revamping label located near the placeholder for recommended maximum wattage.