Installation Guide

ROOF FLASHINGS
INSTRUCTION GUIDE
2
3
4
5
6
7
1
Make sure the roof is free of all debris and is ready for
shingle installation.
Chamfer the pipe end prior to the ashing installation.
Install the shingles in rows starting from the bottom
of the roof and work upwards to the peak. (Be sure to
overlap the row below for good waterproong qualities.)
Once you are near the pipe penetration, push the ashing down over the chamfered pipe end
and position it ush against the felt paper layer and shingles.
Secure the ashing with roong nails and make sure that all nails are concealed under the next
few rows of shingles to keep the roong system leak free.
Install the shingles in rows to the top of the roof.
Test the ashing by running water over it for 3 to 5 minutes.
©2020 Oatey SCS. All Rights Reserved. This information is based on data believed to be reliable but Oatey makes no warranties, express or implied, as to its accuracy and assumes no liability arising out
of its use. The data listed falls within the normal range of product properties but should not be used to establish specication limits or used alone as the basis of design. Oatey’s liability to purchasers is
expressly limited to the terms and conditions of sale. Oatey is trademark of Oatey Co. All other trademarks can be found www.Oatey.com.
Oatey.com

Summary of content (1 pages)