Average Joint Cure Times for
PVC, ABS and CPVC Solvent Cements
Pipe
Diameter
½" ¾" 1" 1¼" 1½" 2" 3" 4" 6" 8"
Number
of Joints
325 250 150 125 90 70 50 30 10 8
Contact Oatey Technical Services for cure times for pipe
larger than 8" diameter.
This data is applicable only for new piping installations and not recommended for
repair or cut-ins on hot and cold water distribution systems. Please contact Oatey
Technical Service for recommendations on Cure Times for such applications.
DO NOT test PVC and CPVC piping systems with compressed air or gas.
NOTES: Cure schedule is the time required before pressure testing the system
- This chart can be used as a guideline to determine joint cure
- Cure times stated are for conditions with relative humidity of 60% or less
+ In damp or humid weather, allow 50% additional cure time
Oatey Co.
Cleveland, OH 44135
800-321-9532
Oatey.com
PVC & ABS
Pipe Diameter
Temperature during assembly and cure period
60° to
10F
40° to
60°F
20° to
40°F
0° to 20°F
½" to 1¼"
Up to 180 psi 15 min 20 min 30 min
Please
contact Oatey
Technical
Services for
cure time
information
180 psi + 4 hours 8 hours 36 hours
1½" to 3"
Up to 180 psi 30 min 45 min 60 min
180 psi + 8 hours 16 hours 3 days
4" to 5"
Up to 180 psi 2 hours 4 hours 36 hours
180 psi + 12 hours 24 hours 4 days
6" to 8"
Up to 180 psi 8 hours 16 hours 3 days
180 psi + 24 hours 48 hours 9 days
CPVC
Pipe Diameter
Temperature during assembly and cure period
60° to
10F
40° to
60°F
20° to
40°F
0° to 20°F
½" to 1¼"
Up to 180 psi 1 hour 2 hours
Please contact
Oatey Technical
Services for cure
time information
180 psi + 6 hours 12 hours
1½" to 3"
Up to 180 psi 2 hours 4 hrs
180 psi + 12 hours 24 hours
4" to 5"
Up to 180 psi 6 hours 12 hours
180 psi + 18 hours 36 hours
6" to 8"
Up to 180 psi 8 hours 16 hours
180 psi + 24 hours 48 hours
Set Up & Curing Times
The set up/cure time is dependent on several factors.
The pipe size, socket t, ambient temperature,
relative humidity, solvent cement used and the
system operating pressure should all be considered
when determining set up/cure times.
Average Handling/Set Up Times
for PVC/CPVC Solvent Cements
Handling/Set Up Time is the time required prior to
handling the joint. In damp or humid weather, allow
50% additional time.
Average Number of Joints
Per Quart of Solvent Cement
Pipe Diameter
Temperature during assembly
60° to
10F
40° to
60°F
20° to
40°F
0° to
20°F
½" to 1¼" 2 minutes 5 minutes 8 minutes
10 minutes
1½" to 3" 5 minutes 10 minutes 12 minutes
15 minutes
4" to 5" 15 minutes 30 minutes 1 hour
2 hours
6" to 8" 30 minutes 90 minutes 3 hours
6 hours
Contact Oatey Technical Services for set up times for
pipe larger than 8" diameter.
These gures should only be used as a general guide. Conditions in the eld
may vary.
These gures are estimates based on laboratory testing. Conditions in the
eld may vary.
©2020 Oatey SCS. All Rights Reserved.
This information is based on data believed to be reliable but Oatey makes no warranties, express or implied, as to its accuracy and assumes no liability
arising out of its use. The data listed falls within the normal range of product properties but should not be used to establish specication limits or used
alone as the basis of design. Oatey’s liability to purchasers is expressly limited to the terms and conditions of sale. Oatey is a trademark of Oatey Co. All
other trademarks can be found on Oatey.com. LCS358G WEB 11/20
SOLVENT WELD
CURE TIMES

Summary of content (1 pages)