Installation Guide

INSTRUCTION GUIDE
Oatey.com
©2023 Oatey SCS. All Rights Reserved. This information is based on data believed to be reliable but Oatey makes no warranties, express or implied, as to its accuracy and assumes no liability arising out
of its use. The data listed falls within the normal range of product properties but should not be used to establish specication limits or used alone as the basis of design. Oatey’s liability to purchasers is
expressly limited to the terms and conditions of sale. Oatey is trademark of Oatey Co. All other trademarks can be found www.Oatey.com.
PVC HEAVY DUTY P-TRAP
2
5
7
6
3
4
1
Remove nut (A) and washer (B) from SCH. 40 connector (C).
Follow instructions on PVC solvent cement to attach connector (C)
to outside of SCH. 40 stub out pipe (D).
Measure and cut wall tube (E) to length required.
Position nut (J) and washer (I) on tailpiece (K). (Use reducer washer if tailpiece is 1-1/4 in.)
Tighten nuts. CHECK FOR LEAKS.
Position J-bend (H) onto tailpiece (K).
Position nut (F) and washer (G) on wall tube (E).
Place nut (A) and washer (B) onto wall tube (E) and insert into waste connector (C).

Summary of content (1 pages)