Installation & Assembly

SUPPLY BOXES
INSTRUCTION GUIDE
2
3
4
5
6
1
Determine the height of the supply outlet box, a normal
height is 36 inches to 42 inches from the nished oor
to the bottom of the box.
Install the nailing brackets to the box and align the box
with the measurements on the studs.
Solvent cement the drainpipe to the box hub using
approved Oatey primer and cement.
Secure the water lines into the valve bodies then turn the water on to check for leaks.
Pressure test the DWV system or branch line and check for leaks in the drain to box connection.
If pressure testing is not possible, check with your local building ofcials for an approved testing
procedure. this should be completed before the drywall is installed.
Connect the supply line hoses to the valves and insert the drain hose into the drain opening of
the box. Once all connections have been tightened, cycle the appliance while checking for leaks.
©2020 Oatey SCS. All Rights Reserved. This information is based on data believed to be reliable but Oatey makes no warranties, express or implied, as to its accuracy and assumes no liability arising out
of its use. The data listed falls within the normal range of product properties but should not be used to establish specication limits or used alone as the basis of design. Oatey’s liability to purchasers is
expressly limited to the terms and conditions of sale. Oatey is trademark of Oatey Co. All other trademarks can be found www.Oatey.com.
Oatey.com

Summary of content (1 pages)