2018.1

Table Of Contents
Other Resources
l
OL Connect Designer Templates, DataMapper or Package files, copied from the folder
where they reside.
l
All Postscript, TrueType, Open Type and other host based fonts used in templates must
be reinstalled on the new workstation.
l
Import all dynamic images and make sure their paths match those in the old server.
l Make sure the new workstation can also access network or remote images, JavaScript,
CSS, JSON, and HTML resources referenced in the Connect templates.
Secondary Software and Licenses
The following only apply for specific secondary products and licenses that interacts or is
integrated into the main product.
Image, Fax and Search Modules
l Reconfigure the Image and Fax outputs with the new host information.
l Import the Search Profile and rebuild the database in order to generate the database
structure required by the Workflow.
Capture
l Download the latest version of the Anoto PenDirector.
l Before installing the PenDirector, make sure the pen’s docking station isn’t plugged into
the server. Then install the PenDirector.
l Stop the Messenger 8 service on old and new server from the Workflow menu bar > Tools
> Service Console > Messenger > right-click and select Stop.
l Import the following files and folders from the old server into their equivalent location on
the new server:
C:\ProgramData\Objectif Lune\PlanetPress Workflow 8\PlanetPress
Watch\capture\PPCaptureDefault.mdb
C:\ProgramData\Objectif Lune\PlanetPress Workflow 8\PlanetPress
Watch\DocumentManager
C:\ProgramData\Objectif Lune\PlanetPress Workflow 8\PlanetPress
Watch\PGC
Page 60