2019.2

Table Of Contents
to the old computer will be lost unless the steps to migrate are reproduce again.
Once a Pen has been docked and the data transfer done, its memory is wiped, thus
rending the parallel mode very hard to produce. It is not impossible, but describing how it
can be done is beyond the scope of this migration article.
Steps to migrate:
1. Update existing installation to PlanetPress Suite version 7.6 if not already done.
2. Install PlanetPress Connect Workflow 2019.2 on new computer.
3.
The Anoto PenDirector must be installed. It if is not, you can download it from here and
then install it.
Note
It is strongly recommended that you install the latest version of the PenDirector.
Please use the link provided on the previous line.
Do not get any other version of the PenDirector from the Anoto website, as
they will not have been set up correctly for our Capture solution.
Note
Prior to installation, make sure you unplug the Pen docking station from the USB
port on the computer where you are about to install the Anoto PenDirector.
4. Do the following for both PlanetPress Suite version 7.6 and PlanetPress Connect
Workflow 8.
1. Open Workflow Service Console. This can be done either via the Windows Start
Menu, or from within Workflow Configuration application (via menu option Tools
>Service Console).
2.
Select Messenger in the tree list, right click and select Stop from the context
menu.
Page 92