2020.1

Table Of Contents
l
C:\Program Files\Objectif Lune\OL Connect\Connect
Server\Server.ini
l
C:\Program Files\Objectif Lune\OL Connect\Connect Merge
Engine\MergeEngine.ini
l
C:\Program Files\Objectif Lune\OL Connect\Connect
Weaver Engine\WeaverEngine.ini
4.
Now start the OLConnect_Server service
Configuring the Server Extensions
In the case where the OLConnect MySQL is installed on the new Master Server, it is important
to reconnect all Server Extension systems to the new Master Server.
Perform the following action on each Server Extension:
1.
Stop the OLConnect_ServerExtension service from Control Panel > Administrative
Tools > Services > OLConnect_ServerExtension > Stop.
2. Open the Server Extension Configuration from:
C:\Program Files\Objectif Lune\OL Connect\Connect Server
Extension\ServerExtension.exe
3. Click on Database Connection and configure the JDBC Database connection settings so
that the hostname points to the new Master Server.
4. Click on Scheduling and type in the location of the new Master Server.
5.
Start the OLConnect_ServerExtension service.
Transferring software licenses
Once all the above resources have been transferred over to the new server, it is recommended
to thoroughly test the new system - in demo mode - with sample files under normal production
load to identify points of improvement and make sure the output matches the user’s
expectation.
Output generated at this point will normally bear a watermark which can be removed by
transferring licenses from the old server to the new one.
l To transfer Connect and Workflow licenses, the user is usually required to complete a
License Transfer Agreement which can be obtained from their local Customer Care
department.
Page 64