Axis/Anvil System Installation Guide TOOLS REQUIRED: Powered screwdriver, soft rubber hammer. eg Inset L g Axis Le eg Anvil L myolgoffice.
AXIS SYSTEM WORKSTATION Installation Guide AXIS SYSTEM WORKSTATION Installation Guide Axis/Anvil System Workstation Axis/Anvil System Straightline Axis/Anvil System 120° Axis/Anvil Single Workstation Axis/Anvil Single Desk Axis/Anvil Hung Screen Axis/Anvil CKD Legs 3 8 13 17 19 21 23 Axis/Anvil Installation Guide 3
AXIS SYSTEM WORKSTATION Installation Guide AXKP510 or ECH/.. AX....T RANS AX....T or ECH/.. AX....T . or ECH/. AX....T TRANS AX.... Axis/Anvil System Workstation Axis/Anvil System Straightline Axis/Anvil System 120° Axis/Anvil Single Workstation Axis/Anvil Single Desk Axis/Anvil Hung Screen Axis/Anvil CKD Legs 3 8 13 17 19 21 23 AX. ...T ECH /.. o r AX. ...T RAN S OPTIONAL RETURN SCREENS S TRAN AX.... OPCBSC1/E2 25mm, E1 TOP AXRAIL....A/W OPCBSCBR/E AXLEGDE..../W A AXLEGD...
Axis/Anvil System Workstation Axis/Anvil System Straightline Axis/Anvil System 120° Axis/Anvil Single Workstation Axis/Anvil Single Desk Axis/Anvil Hung Screen Axis/Anvil CKD Legs AXIS SYSTEM WORKSTATION Installation Guide 1 3 8 13 17 19 21 23 2 A A Assemble frames & rails together, loosely (1 turn from tight). 3 Assemble screen brackets to frame, loosely (1 turn from tight). 4 DESK TOP DESK SIDE RAIL SCREW 5mm Fix desk top with 5mm overhang over metal frame.
Axis/Anvil System Workstation Axis/Anvil System Straightline Axis/Anvil System 120° Axis/Anvil Single Workstation Axis/Anvil Single Desk Axis/Anvil Hung Screen Axis/Anvil CKD Legs AXIS SYSTEM WORKSTATION Installation Guide 5 6 Slide screen pole over bracket & attach screens to pole with top slug connectors. 7 3 8 13 17 19 21 23 ENDS IN FIRST ENDS IN FIRST If not using wing screens then gently attach the 3 caps simultaneously tapping into position.
Axis/Anvil System Workstation Axis/Anvil System Straightline Axis/Anvil System 120° Axis/Anvil Single Workstation Axis/Anvil Single Desk Axis/Anvil Hung Screen Axis/Anvil CKD Legs AXIS SYSTEM WORKSTATION Installation Guide 7 Fully tighten all rails to frame screws, & then screen bracket screws. 3 8 13 17 19 21 23 8 Attach cable trays with screws provided.
AXIS SYSTEM STRAIGHTLINE Installation Guide AXIS SYSTEM STRAIGHTLINE Installation Guide Axis/Anvil System Workstation Axis/Anvil System Straightline Axis/Anvil System 120° Axis/Anvil Single Workstation Axis/Anvil Single Desk Axis/Anvil Hung Screen Axis/Anvil CKD Legs 3 8 13 17 19 21 23 Axis/Anvil Installation Guide 8
AXIS SYSTEM STRAIGHTLINE Installation Guide AXKP510 or ECH/.. AX....T Axis/Anvil System Workstation Axis/Anvil System Straightline Axis/Anvil System 120° Axis/Anvil Single Workstation Axis/Anvil Single Desk Axis/Anvil Hung Screen Axis/Anvil CKD Legs 3 8 13 17 19 21 23 S TRAN AX.... or ECH/.. AX....T OPTIONAL RETURN SCREENS S TRAN AX.... OPCBSC1/E2 25mm, E1 TOP A AXRAIL....A/W OPCBSCBR/E OPCBSCBR/M A AXLEGDS..../W OPCBSCBR/E AXLEGDE..../W AXDTRAY...
Axis/Anvil System Workstation Axis/Anvil System Straightline Axis/Anvil System 120° Axis/Anvil Single Workstation Axis/Anvil Single Desk Axis/Anvil Hung Screen Axis/Anvil CKD Legs AXIS SYSTEM STRAIGHTLINE Installation Guide 1 A 3 8 13 17 19 21 23 2 A Assemble frames & rails together, loosely (1 turn from tight). 3 Assemble screen brackets to frame, loosely (1 turn from tight). 4 DESK TOP DESK SIDE RAIL SCREW 5mm Fix desk top with 5mm overhang over metal frame.
Axis/Anvil System Workstation Axis/Anvil System Straightline Axis/Anvil System 120° Axis/Anvil Single Workstation Axis/Anvil Single Desk Axis/Anvil Hung Screen Axis/Anvil CKD Legs AXIS SYSTEM STRAIGHTLINE Installation Guide 5 6 Slide screen pole over bracket & attach screens to pole with top slug connectors. 7 3 8 13 17 19 21 23 ENDS IN FIRST ENDS IN FIRST If not using wing screens then gently attach the 3 caps simultaneously tapping into position.
Axis/Anvil System Workstation Axis/Anvil System Straightline Axis/Anvil System 120° Axis/Anvil Single Workstation Axis/Anvil Single Desk Axis/Anvil Hung Screen Axis/Anvil CKD Legs AXIS SYSTEM STRAIGHTLINE Installation Guide 9 Fully tighten all rails to frame screws, & then screen bracket screws. 3 8 13 17 19 21 23 10 Attach cable trays with screws provided.
AXIS SYSTEM 120º Installation Guide Axis/Anvil System Workstation 3 Axis/Anvil System Straightline 8 Axis/Anvil System 120° 13 Axis/Anvil Single Workstation 17 Axis/Anvil Single Desk 19 Axis/Anvil Hung Screen 21 Axis/Anvil CKD Legs 23 Axis/Anvil Installation Guide 13
Axis/Anvil System Workstation 3 Axis/Anvil System Straightline 8 Axis/Anvil System 120° 13 Axis/Anvil Single Workstation 17 Axis/Anvil Single Desk 19 Axis/Anvil Hung Screen 21 Axis/Anvil CKD Legs 23 AXIS SYSTEM 120º Installation Guide AX...TECH/.. or AX...
Axis/Anvil System Workstation 3 Axis/Anvil System Straightline 8 Axis/Anvil System 120° 13 Axis/Anvil Single Workstation 17 Axis/Anvil Single Desk 19 Axis/Anvil Hung Screen 21 Axis/Anvil CKD Legs 23 AXIS SYSTEM 120º Installation Guide 1 2 A A Assemble frames & rails together, loosely (1 turn from tight). 3 Assemble screen brackets to frame, loosely (1 turn from tight). 4 DESK TOP DESK SIDE RAIL SCREW 5mm Fix desk top with 5mm overhang over metal frame.
Axis/Anvil System Workstation 3 Axis/Anvil System Straightline 8 Axis/Anvil System 120° 13 Axis/Anvil Single Workstation 17 Axis/Anvil Single Desk 19 Axis/Anvil Hung Screen 21 Axis/Anvil CKD Legs 23 AXIS SYSTEM 120º Installation Guide 5 6 DESK TOP RAIL Attach screen end seals with soft non-marking mallet. 7 Fully tighten all rails to frame screws, & then screen bracket screws. DATA PLATE Fit data rails with screws into rails. 8 Attach cable trays with screws provided.
AXIS WORKSTATION Installation Guide Axis/Anvil System Workstation 3 Axis/Anvil System Straightline 8 Axis/Anvil System 120° 13 Axis/Anvil Single Workstation 17 Axis/Anvil Single Desk 19 Axis/Anvil Hung Screen 21 Axis/Anvil CKD Legs 23 Axis/Anvil Installation Guide 17
Axis/Anvil System Workstation 3 Axis/Anvil System Straightline 8 Axis/Anvil System 120° 13 Axis/Anvil Single Workstation 17 Axis/Anvil Single Desk 19 Axis/Anvil Hung Screen 21 Axis/Anvil CKD Legs 23 AXIS WORKSTATION Installation Guide Desk Top Desk Side Rail Screw 5mm STEP 1: Assemble frames & rails together, loosely (1 turn from tight). STEP 2: Fix desk top with 5mm overhang over metal frame. Lastly, fully tighten all rail to frame screws.
AXIS DESK Installation Guide Axis/Anvil System Workstation 3 Axis/Anvil System Straightline 8 Axis/Anvil System 120° 13 Axis/Anvil Single Workstation 17 Axis/Anvil Single Desk 19 Axis/Anvil Hung Screen 21 Axis/Anvil CKD Legs 23 Axis/Anvil Installation Guide 19
AXIS DESK Installation Guide Axis/Anvil System Workstation 3 Axis/Anvil System Straightline 8 Axis/Anvil System 120° 13 Axis/Anvil Single Workstation 17 Axis/Anvil Single Desk 19 Axis/Anvil Hung Screen 21 Axis/Anvil CKD Legs 23 Desk Top Desk Side Rail Screw 5mm STEP 1: Assemble frames & rails together, loosely (1 turn from tight). STEP 2: Fix desk top with 5mm overhang over metal frame. Lastly, fully tighten all rail to frame screws.
AXIS HUNG SCREEN Installation Guide Axis/Anvil System Workstation 3 Axis/Anvil System Straightline 8 Axis/Anvil System 120° 13 Axis/Anvil Single Workstation 17 Axis/Anvil Single Desk 19 Axis/Anvil Hung Screen 21 Axis/Anvil CKD Legs 23 Axis/Anvil Installation Guide 21
AXIS HUNG SCREEN Installation Guide STEP 1: Fully tighten brackets onto screen. Axis/Anvil System Workstation 3 Axis/Anvil System Straightline 8 Axis/Anvil System 120° 13 Axis/Anvil Single Workstation 17 Axis/Anvil Single Desk 19 Axis/Anvil Hung Screen 21 Axis/Anvil CKD Legs 23 STEP 2: Carefully slide the screen onto the back of the worksurface, keeping the screen in the centre of the desk. STEP 3: Fully tighten the small grub screws on the underside of the bracket.
AXIS CKD LEGS Installation Guide Axis/Anvil System Workstation 3 Axis/Anvil System Straightline 8 Axis/Anvil System 120° 13 Axis/Anvil Single Workstation 17 Axis/Anvil Single Desk 19 Axis/Anvil Hung Screen 21 Axis/Anvil CKD Legs 23 STEP 1: Slide legs into ends of rail, and fully tighten all screws. STEP 1: Locate legs on underside of rail, and fully tighten all screws.
AXIS CKD LEGS Installation Guide Axis/Anvil System Workstation 3 Axis/Anvil System Straightline 8 Axis/Anvil System 120° 13 Axis/Anvil Single Workstation 17 Axis/Anvil Single Desk 19 Axis/Anvil Hung Screen 21 Axis/Anvil CKD Legs 23 STEP 1: Slide legs into ends of rail, and fully tighten all screws.
Axis Bar Leaner - Double Installation Guide TOOLS REQUIRED: Powered screwdriver myolgoffice.
AXIS BAR LEANER - DOUBLE Installation Guide * To prevent possible scratches or damage, assemble the desk/table on a soft surface such as a blanket, carpet or packaging.
AXIS BAR LEANER - DOUBLE Installation Guide STEP 1: Assemble corner legs and short rails together and fully tighten with provided screws. STEP 2: Assemble center legs and short rails together and fully tighten with provided screws. Desk Top Desk Back Rail Screw 5mm STEP 3: Assembly leg frames and long rails together and fully tighten with provided screws.
Axis Bar Leaner Installation Guide TOOLS REQUIRED: Powered screwdriver myolgoffice.
AXIS BAR LEANER Installation Guide * To prevent possible scratches or damage, assemble the desk/table on a soft surface such as a blanket, carpet or packaging.
AXIS BAR LEANER Installation Guide STEP 1: Assemble corner legs and short rails together and fully tighten with provided screws. STEP 2: Assembly end leg frames and long rails together and fully tighten with provided screws. Desk Top Desk Back Rail Screw 5mm STEP 3: Pre-drill holes into the worktop, place worktop on a clean, flat surface and fully tighten the worktop to each rail using the provided screws. COMPLETE: Using 2 people rotate table into upright position.
AXIS DESK AND RETURN Installation Guide
AXIS DESK AND RETURN Installation Guide STEP 1: Pre-drill 3 holes into the Axis/Anvil leg where the stop/end bracket is located. STEP 2: Assemble frames & rails together, loosely (1 turn from tight).
AXIS DESK AND RETURN Installation Guide Desk Top Desk Side Rail Screw 5mm STEP 3: Fix desk top with 5mm overhang over metal frame. Lastly, fully tighten all rail to frame screws. STEP 5: Lastly fully tighten the 2 optional support rails to the underside of the worksurface, behind the joining plate. STEP 4: Attach the provided worksuface joining plate to the underside of the 2 worksurfaces. Fully tighten screws.
Axis Desking Installation Guide TOOLS REQUIRED: Powered screwdriver myolgoffice.
Axis Desking INSTALLATION GUIDE 01 02 Desk Top Desk Back Rail Screw 5mm Assemble frames and rails together, loosely (1 turn from tight). Fix worksurface with 5mm overhang to frame, then fully tighten all rail to frame screws. 03 Pre-drill holes into the rail, fully tighten cable tray with provided screws. Page 1 info@olgoffice.
AXIS DESK Installation Guide
AXIS DESK Installation Guide * To prevent possible scratches or damage, assemble the Desk upside down on a soft surface such as a blanket, carpet or packaging. Recommended 2-person Step * Attach Leg to the Top assembly by using Bolts, spring washer, flat washer. Tighten using the Allen Wrench provided. Desk Top Desk Side Rail Screw 5mm STEP 1: Assemble frames & rails together, loosely (1 turn from tight). STEP 2: Fix desk top with 5mm overhang over metal frame.
AXIS DESK (WITH MODESTY) Installation Guide STEP 3: Position the modesty behind the rail. FINISHED STEP 4: Fully tighten the modesty to the rail with provided screws.
AXIS SYSTEM RETURN SCREEN OPTION Installation Guide
AXIS SYSTEM RETURN SCREEN OPTION Installation Guide 1 AX-KP510 POLE 2 BUTT TIGHT TO POLE OPCBSC1/E2 PENCIL MARK OUT END OF SCREEN Carefully remove 1 end cap & seal & butt tight against pole. Mark out end of screen on desk. 3 Remove screen & fix bracket in place. 4 AX...TECH/... or AX...TRANS Remove other end seal & attach screen to bracket with self tapper screws. Attach screen end seal with soft non-marking mallet.
AXIS SYSTEM RETURN SCREEN OPTION Installation Guide 5 Attach top slug connector to screen/pole join. 6 Install all top caps similtaneously down all together gently tapping with a soft non-marking mallet.
Axis Single-sided System Installation Guide TOOLS REQUIRED: Powered screwdriver olgoffice.
AXIS SINGLE-SIDED SYSTEM Installation Guide * To prevent possible scratches or damage, assemble the Desk upside down on a soft surface such as a blanket, carpet or packaging. Recommended 2-person Step * Attach Leg to the Top assembly by using Bolts, spring washer, flat washer. Tighten using the Allen Wrench provided. End Leg STEP 1: Mid Leg Attach spigots to the frame, fully tighten with provided screws.
AXIS SINGLE-SIDED SYSTEM Installation Guide STEP 2: Assemble frames & rails together, loosely (1 turn from tight). Desk Top Desk Back Rail Screw 5mm Step 3: Fix desk top with 5mm overhang over metal frame. Lastly, fully tighten all rail to frame screws.
AXIS SYSTEM 120º Installation Guide
AXIS SYSTEM 120º Installation Guide AX...TECH/.. or AX...
AXIS SYSTEM 120º Installation Guide 1 2 A A Assemble frames & rails together, loosely (1 turn from tight). 3 Assemble screen brackets to frame, loosely (1 turn from tight). 4 DESK TOP DESK SIDE RAIL SCREW 5mm Fix desk top with 5mm overhang over metal frame. Where desktops butt together, make sure these are fitted tight together. Carefully remove end seal on screen & fit screen between end brackets & screw self tappers to fix screen tightly.
AXIS SYSTEM 120º Installation Guide 5 6 DESK TOP RAIL Attach screen end seals with soft non-marking mallet. 7 Fully tighten all rails to frame screws, & then screen bracket screws. Fit data rails with screws into rails. 8 Attach cable trays with screws provided.
AXIS SYSTEM STRAIGHTLINE Installation Guide
AXIS SYSTEM STRAIGHTLINE Installation Guide AXKP510 or ECH/.. AX....T S TRAN AX.... or ECH/.. AX....T OPTIONAL RETURN SCREENS S TRAN AX.... OPCBSC1/E2 25mm, E1 TOP A AXRAIL....A/W OPCBSCBR/E OPCBSCBR/M A AXLEGDS..../W OPCBSCBR/E AXLEGDE..../W AXDTRAY...
AXIS SYSTEM STRAIGHTLINE Installation Guide 1 A 2 A Assemble frames & rails together, loosely (1 turn from tight). 3 Assemble screen brackets to frame, loosely (1 turn from tight). 4 DESK TOP DESK SIDE RAIL SCREW 5mm Fix desk top with 5mm overhang over metal frame. Where desktops butt together, make sure these are fitted tight together. Carefully remove end seal on screen & fit screen between end brackets & screw self tappers to fix screen tightly.
AXIS SYSTEM STRAIGHTLINE Installation Guide 5 6 Slide screen pole over bracket & attach screens to pole with top slug connectors. 7 ENDS IN FIRST ENDS IN FIRST If not using wing screens then gently attach the 3 caps simultaneously tapping into position. 8 RAIL If for whatever reason you have to remove the top seal, then to refit, slightly arc in the middle, placing the 2 ends into location, & gently tap down. Fit data rails with screws into rails.
AXIS SYSTEM STRAIGHTLINE Installation Guide 9 Fully tighten all rails to frame screws, & then screen bracket screws. 10 Attach cable trays with screws provided.
AXIS SYSTEM WORKSTATION Installation Guide
AXIS SYSTEM WORKSTATION Installation Guide AXKP510 or ECH/.. AX....T RANS AX....T or ECH/.. AX....T . or ECH/. AX....T TRANS AX.... AX. ...T ECH /.. o r AX. ...T RAN S OPTIONAL RETURN SCREENS S TRAN AX.... OPCBSC1/E2 25mm, E1 TOP AXRAIL....A/W OPCBSCBR/E AXLEGDE..../W A AXLEGD...W AX4LEG90W OPCBSCBR/E AX2LEG90W OPCBSCBR/M AXLEGDS..../W AXLEGDE..../W OPCBSCBR/E AXDTRAY.../W A AXRAIL....A/W AXLEGD...
AXIS SYSTEM WORKSTATION Installation Guide 1 2 A A Assemble frames & rails together, loosely (1 turn from tight). 3 Assemble screen brackets to frame, loosely (1 turn from tight). 4 DESK TOP DESK SIDE RAIL SCREW 5mm Fix desk top with 5mm overhang over metal frame. Where desktops butt together, make sure these are fitted tight together. Carefully remove end seal on screen & fit screen between end brackets & screw self tappers to fix screen tightly.
AXIS SYSTEM WORKSTATION Installation Guide 5 6 Slide screen pole over bracket & attach screens to pole with top slug connectors. 7 ENDS IN FIRST ENDS IN FIRST If not using wing screens then gently attach the 3 caps simultaneously tapping into position. 8 RAIL If for whatever reason you have to remove the top seal, then to refit, slightly arc in the middle, placing the 2 ends into location, & gently tap down. Fit data rails with screws into rails.
AXIS SYSTEM WORKSTATION Installation Guide 7 Fully tighten all rails to frame screws, & then screen bracket screws. 8 Attach cable trays with screws provided.
Axis Offset Hung Screen with side fix cable tray into screen and above desk power & data plate Installation Guide - Version 2 TOOLS REQUIRED: Powered screwdriver myolgoffice.
Axis Offset Hung Screen with side fix cable tray into screen and above desk power & data plate Installation Guide *To prevent possible scratches or damage, assemble the desk on a soft surface such as a blanket, carpet or packaging. *Attach screen, cable tray and power data plate to the desk assembly by using bolts, spring washer, flat washer. Tighten using the allen wrench provided. STEP 1: Fully tighten brackets onto screen.
Axis Offset Hung Screen with side fix cable tray into screen and above desk power & data plate Installation Guide STEP 3: Fully tighten the small grub screws on the underside of the brackets, so they grip under the desk frame-rail. STEP 4: STEP 5: Pre-drill starter holes into the screen, fully tighten cable tray with provided self-tapping screws. COMPLETE. Position the power data plate. Pre-drill holes into the rail, fully tighten power data plate with provided screws.
Axis Standard Hung Screen with side fix cable tray into rail and below desk power & data plate Installation Guide - Version 2 TOOLS REQUIRED: Powered screwdriver myolgoffice.
Axis Standard Hung Screen with side fix cable tray into rail and below desk power & data plate Installation Guide *To prevent possible scratches or damage, assemble the desk on a soft surface such as a blanket, carpet or packaging. *Attach screen, cable tray and power data plate to the desk assembly by using bolts, spring washer, flat washer. Tighten using the allen wrench provided. STEP 1: Fully tighten brackets onto screen.
Axis Standard Hung Screen with side fix cable tray into rail and below desk power & data plate Installation Guide STEP 3: Fully tighten the small grub screws on the underside of the bracket, so they grip underside of desk frame rail. STEP 4: STEP 5: Pre-drill starter holes into underside of the worksurface, fully tighten power data service mounting plate with provided self-tapping screws. COMPLETE Position cable tray, pre-drill holes into the rail, fully tighten cable tray with provided screws.