User Manual

Omega II
®
Installation, Operation & Maintenance
Combustion Research Corporation Page 43
In storage areas where stacking of materials may occur, the installer must provide signs that specify the maximum stacking
height so as to maintain the required clearance to combustibles. The following is a temporary sign that can be used until a
permanent label is obtained from your representative or Combustion Research Corporation - Request P/N 5566.006.
Attach
this label near the Reflect-O-Ray
®
heater or by the thermostat.