User’s Guide Shop online at omega.com e-mail: info@omega.com For latest product manuals: omegamanual.
OMEGAnet ® Online Service www.omega.com Internet e-mail info@omega.com Servicing North America: USA: ISO 9001 Certified Canada: One Omega Drive, P.O. Box 4047 Stamford CT 06907-0047 TEL: (203) 359-1660 e-mail: info@omega.com 976 Bergar Laval (Quebec) H7L 5A1, Canada TEL: (514) 856-6928 e-mail: info@omega.
Unpacking Instructions After opening the shipping carton, remove the molded foam top from the carton. Remove the platform and place onto a flat, level and steady surface. The 100 LB and 250 LB capacity platforms are shipped with inserts to protect them from shock loading during shipment. These inserts must be removed before attempting to operate the platform. To remove the foam inserts, begin by removing the top platform cover.
Load Cell Wiring The LCS6400 mild steel version comes with a round, CPC style connector that mates with all WM7400 and WM7600 digital indicators. The Stainless Steel version comes with out this connector so that the load cell cable may be inserted through the watertight cable clamp used on wash down indicators.
WARRANTY/DISCLAIMER OMEGA ENGINEERING, INC. warrants this unit to be free of defects in materials and workmanship for a period of 13 months from date of purchase. OMEGA’s WARRANTY adds an additional one (1) month grace period to the normal one (1) year product warranty to cover handling and shipping time. This ensures that OMEGA’s customers receive maximum coverage on each product. If the unit malfunctions, it must be returned to the factory for evaluation.
Where Do I Find Everything I Need for Process Measurement and Control? OMEGA…Of Course! Shop online at www.omega.