Instructions / Assembly
6
ONdURA
Finish your rake edge with metal ashing, either over or under
the last corrugaon edge of the ONDURA-6V sheet. When using
metal ashing under the last corrugaon, be careful to avoid
nailing through your ashing.
Metal ashing under
Corrugaon over raised fascia board edge
Metal ashing over
Alternavely, you could use a one corrugaon strip from an
ONDURA-6V sheet under the last corrugaon edge, or secure
the last corrugaon directly to a raised rake edge.
For hips, sheets from either side
must meet to support hip cover
(an ONDURA ridge cap). Framing
should also be in place beneath
and near enough to the upper
ends to receive nails securing
the hip cover. Snap chalk lines
on each side of hip to mark
area of hip cover. Then cut one
hip secon from an ONDURA-
6V closure strip, and using
rubberized elastomeric ashing cement/caulking, caulk in place,
or seal the hip with Ondulair Slim instead of closure strips.
Install hip cover with 7˝ end laps.
With closure strips
With Ondulair Slim
Hip secon of
Ondura-6V Ridge closure Strip
Eave closure strip
placement
ONDURA-6V
Nail
Flashing
Ridge closure
strip placement
Use elastometric caulking at all
ashing joints and closure strips.
ONDURA-6V
Eave closure
strip
Flashing
Deck
sheathing
Ridge closure
strip
Flashing width should be increased as slope dierences
increase or whenever water build-up on the lower slope can
be substanal.
Deck
sheathing