Instructions / Assembly


OK
OK
Overnailed
Overnailed
Deformed
Wind Wind
Make the installaon against the prevailing wind
Protect the rake
against the wind
using universal
ridge/trim piece
or similar.
Always drive nails vercally on top of the
corrugaons. Avoid deformaons of the at part
due to over-nailing.
Stagger the rows using half shingles. Fix the shingles according
to the order described above.
For correct overlaps, take care that overlapping
guides of the upper and lower shingle are aligned
with each other. If the guides of the lower
shingle are not visible, measure 12.5” between
overlaps.
Use deck roof made of
wood, plywood or OSB and
underlayment complying with
ASTM D-226 Type 2
19
21
22
23
20
11
13
12
14
16
17
18
15
1
3
4
5
2
6
8
9
10
7
2: Full shingle
1: Full shingle
4: Full shingle
5: Full shingle
3: Half shingle
Installaon
Wind
Upper shingle
Overlapping guides
Lower shingle
12.5”
4