Installation Guide

Install Header Lines
Connect 1" pipe to
e
ach valve and run it
t
o the assigned zone.
Use fittings (elbow,
cross or tee) for each
lateral line.
Install Lateral Lines
Connect 3/4"
lateral lines to
the header line.
Run lateral line
to each sprinkler
location.
Install Tees or Elbow
at each sprinkler
location.
Freezing Areas – Install Line Drains
Lateral and Header Lines
Canist
er Heads
: Install an automatic drain valve in the bot
tom inlet of all canister
s.
End of Spr
inkler Line
: Install an automatic drain valve af
ter the last head on the end of eac
h
sloped line.
Low Spots: Install a tee and automatic drain valve for low spots on sprinkler head lines.
Main Line
Manifold: Remove the end cap and install a ball or gate manual drain valve.
Installation
Sprinkler System Layout & Installation Guide
17
9
CONNECT ZONES
1" Male Threaded Fi
PVC or Poly Cross
Header Line
PVC or Poly Tee
Lateral Line
Fittings with
Threaded Outlet
Replace with
Manual Drain
V
alve
07WTM003045 53251-01 rE.qxd 3/2/07 2:30 PM Page 17