Instruction Manual
Table Of Contents
8. Remove the 26-IN Vertical Standards (A) to reveal
the marks made in the previous step. Using 5/16” drill
bit to pre-drill holes into drywall. Then,
install
Drywall
Anchors (AA) into pre-drilled drywall holes.
8
If you are unsure if a stud is located
behind markings, use 1/8" drill bit to
drill all holes. If no stud is present,
then use 5/16" drill bit to make holes
larger for drywall anchors.
PRO TIP
EE
7.
Use a Level to make sure the 26-IN Vertical
Standard (C) are straight. Then mark hole locations
of the
Bottom Mount Wall Clips (EE).
7
Hardware Used
x 1
AA
Drywall Anchor
Use a rubber mallet to lightly tap
Drywall Anchors (AA) into the drywall.
PRO TIP
AA
ASSEMBLY INSTRUCTIONS
9










