User's Manual
Table Of Contents
- 1. INTRODUCTION
- 2. PRESENTATION
- 3. INSTRUCTIONS DE TESTS
- 4. UTILISATION
- 5. FAUSSES ALARMES
- 6. INSTALLATION DE LA BALISE
- 7. SPECIFICATIONS TECHNIQUES
- 8. DECLARATION D'ENREGISTREMENT
- 9. MAINTENANCE
- 10. REMPLACEMENT DES PILES
- 11. REMPLACEMENT DU LARGUEUR HYDROSTATIQUE
- 1. INTRODUCTION
- 2. DESCRIPTION
- 3. TEST INSTRUCTIONS
- 4. INSTRUCTIONS FOR USE
- 5. FALSE ALARMS
- 6. BEACON INSTALLATION
- 7. TECHNICAL SPECIFICATIONS
- 8. REGISTRATION
- 9. MAINTENANCE POLICY
- 10. BATTERY REPLACEMENT
- 11. AUTOMATIC RELEASE SYSTEM REPLACEMENT
DOC09028A
25
ENGLISH ESPAÑOL DEUTSCH FRANÇAIS ITALIANO NEDERLANDS LANG7 LANG8 LANG9 LANG10 LANG11 LANG12
6.2. SafeLink Auto Category 1 (Float Free)
6.2.1. Installation of container
The container should be installed outside
on deck or wheelhouse, or against a bulkhead or any vertical and flat
surface and comply with the following instructions:
• horizontal or vertical position;
• clear area to allow the beacon to rise the surface, should the vessel sink;
Caution: watch rigging, antenna or shroud that could build obstacles;
• easy access to the crew for manual operation;
• strongly fix to the vessel with 4 screws according to drilling mask hereunder.
Note: dimensions are in millimeters (inches in bracket).
Reminder: The instructions plate must be fixed close to the container.